Zero Day Brewery

Project Details: Brewery Build Out

Summer/Winter 2020

925 N 3rd Street, Harrisburg, PA 17102

Trinity Construction turned an old historic building in the City of Harrisburg into a Brewery complete with tasting room, event space, Kitchen, and restaurant. We also constructed an outdoor Courtyard space and offices for the company.

Project Performance by Trinity Construction, LLC:

General Contractor and management for the entire build out, oversaw, coordinated, and planed the entire project from start to finish.

Design, worked with Architects, interior designers, and engineers throughout the project for the design.

Demo, removed all existing interior walls, fixtures, and finishes to gut the property back to studs ready for rebuild.

Structural, removed structurally supporting walls and basement access stairs. We removed and rebuilt floors in several locations using metal I beams, racks and concrete where floors were not strong enough to take the weight of the brew equipment and other brewing apparatus.

Framing, framed all interior walls as per the new proposed layouts using a combination of wood and metal studs.

HVAC, removed all the existing heating and ventilation systems throughout the building and installed a new furnace and AC system, ran all new duct lines, supply and return and installed new thermostats. Installation of the AC units included installing new curbs on the existing roof.

Plumbing, removed all the old existing plumbing throughout the building and installed all new supply and waste lines. Installed new water heaters for the building and hook up. All water supply lines were installed using pex and copper piping and all waste lines were installed using PVC piping.

Sprinklers, installed a complete new sprinkler system in the building where at first there was none. This included installing a new tap-in to the water main supply line running through the nearest street and bringing the supply into the building and hooking up all water supply to the building to feed the new sprinkler system. We also installed all new sprinkler lines and heads.

Electric, removed the existing electrical system in the house, installed new 200-amp panels and all new wiring throughout for all new electrical supply lines.

Low voltage, installed security system, speaker system and fire suppression system throughout the building.

Carpentry, installed all new trim, stairs, doors, cabinetry, and millwork for the building throughout.

Flooring, installed all new tile, carpet and LVP flooring throughout the building.

Insulation, installed all new insulation throughout the building on all floors, ceilings, and walls.

Drywall, hung, taped, and finished all drywall throughout the building.

Painting, painted all wall surfaces, ceilings and trim work including all the doors for the building.

Exterior doors, retro fitted the existing front door to the property to make them functional again. Opened up the rear of the building to install two new garage doors for access to the new courtyard.

Courtyard, installed a courtyard compete with custom barn doors, paving, firepit and entertainment area.

Brew equipment and specialty, we installed walk in coolers, bar equipment, kitchen equipment, brew equipment, access hatch to the basement from first floor, custom built fully waterproof barrel room, fireplaces, brick veneer walls, custom bar, and live edge tables.