The Fox on Washington

Project Details: Eight Unit Apartment

Winter 2019

236 S 2nd Street, Harrisburg, PA 17102

Trinity Construction turned a three-story building into an eight-unit apartment complex in the Historic District of Downtown Harrisburg. We worked in conjunction with By Design Architectural company and Harristown Enterprises for the build out.

Project Performance by Trinity Construction, LLC:

General Contractor and management for the entire build out, oversaw, coordinated, and planed the entire project from start to finish.

Coordinated with structural engineers and Architects for the build out.

Structural, removed structurally supporting floors and rebuilt where structure was failing. Installed additional beams and joists where needed to shore up the existing structure of the building.

Roofing, removed the existing rubber roof on the building and installed a new rubber roof.

Framing, framed all interior walls as per the new proposed layout using wood studs.

HVAC, installed new furnaces and AC systems for the eight units and common area, ran all new duct lines, supply and return and installed new thermostats. Installation of the AC units included installing new curbs on the roof.

Plumbing, Installed all new supply and waste lines. Installed new water heaters for the apartments and hooked up. All water supply lines were installed using pex and copper piping and all waste lines were installed using PVC piping.

Sprinklers, installed a complete new sprinkler system in the building where at first there was none. This included installing a new tap-in to the water main supply line running through the nearest street and bringing the supply into the building and hooking up all water supply to the building to feed the new sprinkler system. We also installed all new sprinkler lines and heads for each apartment and common areas.

Electric, Installed all new 200-amp panels for each apartment and common area and all new wiring throughout for all new electrical supply lines. Installed a new communications and security system for the building for monitoring.

Carpentry, installed all new trim, doors, cabinetry, and millwork for the building throughout.

Flooring, installed all new LVP flooring throughout the building.

Insulation, installed all new insulation throughout the building on all floors, ceilings, and walls.

Drywall, hung, taped, and finished all drywall throughout the building.

Painting, painted all wall surfaces, ceilings and trim work included all the doors for the building.

Windows, removed all the existing windows in the property and installed all new windows throughout including specialized curved windows.